MEP Plans in Gonzales, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Gonzales, prepared for plan check at the City of Gonzales building department, with Title 24 available in the same order.
Gonzales project facts we design around
| County | Monterey County |
|---|---|
| Title 24 climate zone | Climate Zone 3, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permit review | The City of Gonzales building department |
| ADU permits issued, 2021–2025 | 92 (#229 of 450 cities) |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Gonzales
Gonzales issued 92 ADU building permits from 2021 through 2025, the 229th most among the 450 California cities that reported ADU permits. Permits went from 5 in 2021 to 38 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 5 | 15 | 17 | 17 | 38 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 3
- Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
- Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.
Climate Zone 3 requirements in full →
HVAC design for Gonzales
The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 3's coastal, marine-influenced climate. Right-size the heat pump from a real Manual J instead of a tonnage guess.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Salinas | CZ 3 | Pacific Gas and Electric (PG&E) | 865 |
| Monterey | CZ 3 | Pacific Gas and Electric (PG&E) | 446 |
| Pacific Grove | CZ 3 | Pacific Gas and Electric (PG&E) | 218 |
| Seaside | CZ 3 | Pacific Gas and Electric (PG&E) | 169 |
| Carmel-by-the-Sea | CZ 3 | Pacific Gas and Electric (PG&E) | 123 |
| Soledad | CZ 3 | Pacific Gas and Electric (PG&E) | 107 |
Guides for Gonzales projects
Ready for permit-ready MEP plans in Gonzales?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Gonzales; requirements vary by project. Confirm with the City of Gonzales building department.