Monterey County · Climate Zone 3

MEP Plans in Del Rey Oaks, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Del Rey Oaks, prepared for plan check at the City of Del Rey Oaks building department, with Title 24 available in the same order.

Start My Del Rey Oaks Order See Pricing

Del Rey Oaks project facts we design around

CountyMonterey County
Title 24 climate zoneClimate Zone 3, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Del Rey Oaks building department
ADU permits issued, 2021–202524 (#344 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Del Rey Oaks

Del Rey Oaks issued 24 ADU building permits from 2021 through 2025, the 344th most among the 450 California cities that reported ADU permits. Permits went from 5 in 2021 to 5 in 2025.

20212022202320242025
57345

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 3

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.

Climate Zone 3 requirements in full →

HVAC design for Del Rey Oaks

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 3's coastal, marine-influenced climate. Right-size the heat pump from a real Manual J instead of a tonnage guess.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
SalinasCZ 3Pacific Gas and Electric (PG&E)865
MontereyCZ 3Pacific Gas and Electric (PG&E)446
Pacific GroveCZ 3Pacific Gas and Electric (PG&E)218
SeasideCZ 3Pacific Gas and Electric (PG&E)169
Carmel-by-the-SeaCZ 3Pacific Gas and Electric (PG&E)123
SoledadCZ 3Pacific Gas and Electric (PG&E)107

Monterey County → · All California cities and communities →

Ready for permit-ready MEP plans in Del Rey Oaks?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Del Rey Oaks; requirements vary by project. Confirm with the City of Del Rey Oaks building department.