MEP Plans in Catheys Valley, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Catheys Valley (unincorporated Mariposa County), prepared for plan check at Mariposa County Building Department, with Title 24 available in the same order.
Catheys Valley project facts we design around
| County | Mariposa County (unincorporated) |
|---|---|
| Title 24 climate zone | Climate Zone 12, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permits issued by | Mariposa County Building Department |
| ADU permits issued, 2021–2025 | 5 |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Catheys Valley
Mariposa County issued 5 ADU building permits from 2021 through 2025 for addresses in Catheys Valley, based on the county's reports to the state. Permits went from 3 in 2023 to 2 in 2024.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| not reported | not reported | 3 | 2 | not reported |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 12
- Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
- Solar PV sized by the CEC formula kW = (floor area x 0.613) / 1000 + 1.4; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 653 sq ft or smaller.
Climate Zone 12 requirements in full →
HVAC design for Catheys Valley
The California Energy Commission's design-day data for Catheys Valley gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 98°F and a winter design temperature of 21°F.
| Summer design (1%) | 98°F dry bulb / 68°F wet bulb |
|---|---|
| Winter design (median of extremes) | 21°F |
| Daily temperature range | 38°F |
| Elevation | 1,000 ft |
Both seasons matter here. The heat pump is usually sized for the 98°F cooling condition and then checked to confirm it still covers the heating load at 21°F.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Mariposa (unincorp.) | CZ 12 | Pacific Gas and Electric (PG&E) | 57 |
| Concord | CZ 12 | Pacific Gas and Electric (PG&E) | 276 |
| Antioch | CZ 12 | Pacific Gas and Electric (PG&E) | 171 |
| Fairfield | CZ 12 | Pacific Gas and Electric (PG&E) | 79 |
| Sacramento | CZ 12 | Sacramento Municipal Utility District (SMUD) | 1,720 |
Guides for Catheys Valley projects
Ready for permit-ready MEP plans in Catheys Valley?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Catheys Valley; requirements vary by project. Confirm with Mariposa County Building Department.