Unincorporated Alameda County · Climate Zone 3

MEP Plans in Ashland, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Ashland (unincorporated Alameda County), prepared for plan check at Alameda County Public Works Agency – Building Inspection Division, with Title 24 available in the same order.

Start My Ashland Order See Pricing

Ashland project facts we design around

CountyAlameda County (unincorporated)
Title 24 climate zoneClimate Zone 3, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permits issued byAlameda County Public Works Agency – Building Inspection Division
ADU permits issued, 2021–202554
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Ashland

Alameda County issued 54 ADU building permits from 2021 through 2025 for addresses in Ashland, based on the county's reports to the state. Permits went from 1 in 2021 to 14 in 2025.

20212022202320242025
18151614

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 3

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.

Climate Zone 3 requirements in full →

HVAC design for Ashland

The California Energy Commission's design-day data for Ashland gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 85°F and a winter design temperature of 26°F.

Summer design (1%)85°F dry bulb / 64°F wet bulb
Winter design (median of extremes)26°F
Daily temperature range24°F
Elevation45 ft
Heating degree days977

Both seasons matter here. The heat pump is usually sized for the 85°F cooling condition and then checked to confirm it still covers the heating load at 26°F.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system. Some Bay Area cities also have private sewer lateral inspection rules, so ask whether your project triggers one.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
OaklandCZ 3Pacific Gas and Electric (PG&E)1,186
FremontCZ 3Pacific Gas and Electric (PG&E)637
BerkeleyCZ 3Pacific Gas and Electric (PG&E)548
LivermoreCZ 12Pacific Gas and Electric (PG&E)525
PiedmontCZ 3Pacific Gas and Electric (PG&E)409
AlamedaCZ 3Alameda Municipal Power366

Alameda County → · All California cities and communities →

Ready for permit-ready MEP plans in Ashland?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Ashland; requirements vary by project. Confirm with Alameda County Public Works Agency – Building Inspection Division.