MEP Plans in Aptos, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Aptos (unincorporated Santa Cruz County), prepared for plan check at Santa Cruz County Community Development & Infrastructure (CDI) – Building Permits & Safety, with Title 24 available in the same order.
Aptos project facts we design around
| County | Santa Cruz County (unincorporated) |
|---|---|
| Title 24 climate zone | Climate Zone 3, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permits issued by | Santa Cruz County Community Development & Infrastructure (CDI) – Building Permits & Safety |
| ADU permits issued, 2021–2025 | 71 |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Aptos
Santa Cruz County issued 71 ADU building permits from 2021 through 2025 for addresses in Aptos, based on the county's reports to the state. Permits went from 19 in 2021 to 8 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 19 | 10 | 15 | 19 | 8 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 3
- Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
- Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.
Climate Zone 3 requirements in full →
HVAC design for Aptos
The California Energy Commission's design-day data for Aptos gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 87°F and a winter design temperature of 27°F.
| Summer design (1%) | 87°F dry bulb / 65°F wet bulb |
|---|---|
| Winter design (median of extremes) | 27°F |
| Daily temperature range | 30°F |
| Elevation | 500 ft |
Both seasons matter here. The heat pump is usually sized for the 87°F cooling condition and then checked to confirm it still covers the heating load at 27°F.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Santa Cruz | CZ 3 | Pacific Gas and Electric (PG&E) | 446 |
| Watsonville | CZ 3 | Pacific Gas and Electric (PG&E) | 196 |
| Capitola | CZ 3 | Pacific Gas and Electric (PG&E) | 81 |
| Scotts Valley | CZ 3 | Pacific Gas and Electric (PG&E) | 35 |
| Soquel (unincorp.) | CZ 3 | Pacific Gas and Electric (PG&E) | 20 |
| Felton (unincorp.) | CZ 3 | Pacific Gas and Electric (PG&E) | 6 |
Santa Cruz County → · All California cities and communities →
Guides for Aptos projects
Ready for permit-ready MEP plans in Aptos?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Aptos; requirements vary by project. Confirm with Santa Cruz County Community Development & Infrastructure (CDI) – Building Permits & Safety.