MEP Plans in Acampo, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Acampo (unincorporated San Joaquin County), prepared for plan check at San Joaquin County Community Development Department – Building Division, with Title 24 available in the same order.
Acampo project facts we design around
| County | San Joaquin County (unincorporated) |
|---|---|
| Title 24 climate zone | Climate Zone 12, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permits issued by | San Joaquin County Community Development Department – Building Division |
| ADU permits issued, 2021–2025 | 7 |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Acampo
San Joaquin County issued 7 ADU building permits from 2021 through 2025 for addresses in Acampo, based on the county's reports to the state. Permits went from 1 in 2023 to 5 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| not reported | not reported | 1 | 1 | 5 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 12
- Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
- Solar PV sized by the CEC formula kW = (floor area x 0.613) / 1000 + 1.4; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 653 sq ft or smaller.
Climate Zone 12 requirements in full →
HVAC design for Acampo
The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 12's Central Valley-style climate — hot summers, cool winters. Heat pump sized for cooling and verified for winter heating.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Tracy | CZ 12 | Pacific Gas and Electric (PG&E) | 330 |
| Stockton | CZ 12 | Pacific Gas and Electric (PG&E) | 259 |
| Manteca | CZ 12 | Pacific Gas and Electric (PG&E) | 103 |
| Lodi | CZ 12 | Lodi Electric Utility | 94 |
| Ripon | CZ 12 | Pacific Gas and Electric (PG&E) | 45 |
| Lathrop | CZ 12 | Pacific Gas and Electric (PG&E) | 35 |
San Joaquin County → · All California cities and communities →
Guides for Acampo projects
Ready for permit-ready MEP plans in Acampo?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Acampo; requirements vary by project. Confirm with San Joaquin County Community Development Department – Building Division.