Tehama County · Climate Zone 11

MEP Plans in Tehama County, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes anywhere in Tehama County, in its cities and in unincorporated areas, with Title 24 available in the same order.

Start My Tehama County Order See Pricing

Tehama County project facts we design around

County seatRed Bluff
Population64,451 (Census 2024 estimate)
Incorporated cities3
Unincorporated residentsAbout 41,598 (65% of the county)
Permits in unincorporated areasTehama County Building and Safety
Title 24 climate zonesClimate Zone 11. Confirmed by ZIP for every project
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

HVAC design across Tehama County

Climate Zone 11: Central Valley-style climate — hot summers, cool winters.

This is a two-sided load: long stretches above 100°F in summer and cold, foggy winter mornings. The heat pump is usually sized for cooling, then checked to make sure it still carries the heating load at the local winter design temperature. High summer peaks also mean the AC is often the single biggest electrical load, which is what pushes many ADUs into a panel or service upgrade.

  • Heat pump sized for cooling and verified for winter heating
  • Panel / subpanel sizing that accounts for a large cooling load
  • Title 24 envelope and HVAC assumptions that hold up in a demanding zone

Unincorporated Tehama County

Unincorporated communities are permitted by the county, not by a city. County plan check reviews MEP drawings against the same California Mechanical, Electrical and Plumbing Codes and the Title 24 Energy Code as any city, but the submittal checklist, forms and fees are the county's own, so we prepare the set to match. In rural areas, parcels outside a sewer district often rely on a private septic system; adding an ADU can require the county's environmental health division to confirm the system has capacity, and the plumbing plan then shows the connection to the septic tank instead of a sewer lateral.

What's in a Tehama County MEP set

  • Mechanical: HVAC layout, Manual J load calculation, equipment schedule, exhaust and whole-unit ventilation
  • Electrical: power and lighting plan, panel schedule, NEC 220 load calculation, single-line diagram
  • Plumbing: supply and DWV layout, fixture units, water heater, gas (if any), sewer or septic connection
  • Title 24 (add-on): energy compliance for your address's climate zone, coordinated with the MEP design so the two documents agree

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. Standard turnaround is 5 business days with two revisions and corrections included.

Tehama County cities

PlaceClimate zoneElectric utility
Red BluffCZ 11Pacific Gas and Electric (PG&E)

Shown for most addresses in each city. We also serve Tehama County's other 2 cities and every unincorporated community.

Tehama County ADU MEP questions

Who issues building permits for an ADU in unincorporated Tehama County?

In unincorporated areas, home to about 41,598 residents (65% of the county), ADU and residential permits go through Tehama County Building and Safety. Inside the county's 3 incorporated cities, that city's own building department reviews the plans instead. We prepare the MEP set for whichever office has jurisdiction over your address.

What Title 24 climate zones are in Tehama County?

All of Tehama County is in California Climate Zone 11 on the Energy Commission's ZIP-code list. The climate zone drives the Title 24 energy calculation and the HVAC sizing.

Who provides electric service in Tehama County?

It depends on the address. In the Tehama County places listed on this page, most addresses are served by Pacific Gas and Electric (PG&E). We confirm the serving utility for every project, because service upgrades and new meters are requested from the utility, separately from the building permit.

How much do ADU MEP plans cost in Tehama County?

Our pricing is flat across California: single-discipline ADU plans start at $995, a full MEP package for an ADU up to 600 SF is $2,295, and a Title 24 report can be added for $240. Residential (single-family) full MEP packages start at $3,495. Standard turnaround is 5 business days, and corrections are included.

How long does ADU approval take in Tehama County?

California law requires local agencies, counties included, to approve or deny a complete ADU permit application within 60 days. Incomplete or inconsistent drawings are the most common reason the clock restarts, which is why MEP plans that match the architectural set, and a Title 24 report that matches the MEP design, matter.

Ready for permit-ready MEP plans in Tehama County?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Population figures are Census Bureau 2024 estimates; climate zones are from the California Energy Commission's ZIP-code list, weighted by population. Requirements vary by project: confirm with Tehama County Building and Safety or your city's building department.