Unincorporated Imperial County · Climate Zone 15

MEP Plans in Heber, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Heber (unincorporated Imperial County), prepared for plan check at Imperial County Planning & Development Services Department – Building & Safety Division, with Title 24 available in the same order.

Start My Heber Order See Pricing

Heber project facts we design around

CountyImperial County (unincorporated)
Title 24 climate zoneClimate Zone 15, confirmed by ZIP for every project
Electric utility (most addresses)Imperial Irrigation District (IID)
Permits issued byImperial County Planning & Development Services Department – Building & Safety Division
ADU permits issued, 2021–202525
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Heber

Imperial County issued 25 ADU building permits from 2021 through 2025 for addresses in Heber, based on the county's reports to the state. Permits went from 4 in 2022 to 7 in 2025.

20212022202320242025
not reported41137

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 15

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.20 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher; low-sloped roofs 0.63 / 0.75.
  • Solar PV sized by the CEC formula kW = (floor area x 1.56) / 1000 + 1.47; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 212 sq ft or smaller.

Climate Zone 15 requirements in full →

HVAC design for Heber

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 15's high-desert / desert climate with extreme summer heat. Cooling capacity and equipment rated for high outdoor temperatures.

Electrical service from Imperial Irrigation District (IID)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, open that request with Imperial Irrigation District (IID) early; utility lead times are often longer than plan check.

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
El CentroCZ 15Imperial Irrigation District (IID)338
CalexicoCZ 15Imperial Irrigation District (IID)265
ImperialCZ 15Imperial Irrigation District (IID)110
BrawleyCZ 15Imperial Irrigation District (IID)43
HoltvilleCZ 15Imperial Irrigation District (IID)14
WestmorlandCZ 15Imperial Irrigation District (IID)7

Imperial County → · All California cities and communities →

Ready for permit-ready MEP plans in Heber?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Heber; requirements vary by project. Confirm with Imperial County Planning & Development Services Department – Building & Safety Division.