Sacramento County · Climate Zone 12

MEP Plans in Citrus Heights, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Citrus Heights, prepared for plan check at the City of Citrus Heights building department, with Title 24 available in the same order.

Start My Citrus Heights Order See Pricing

Citrus Heights project facts we design around

CountySacramento County
Title 24 climate zoneClimate Zone 12, confirmed by ZIP for every project
Electric utility (most addresses)Sacramento Municipal Utility District (SMUD)
Permit reviewThe City of Citrus Heights building department
ADU permits issued, 2021–2025152 (#169 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Citrus Heights

Citrus Heights issued 152 ADU building permits from 2021 through 2025, the 169th most among the 450 California cities that reported ADU permits. Permits went from 18 in 2021 to 35 in 2025.

20212022202320242025
1839293135

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 12

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
  • Solar PV sized by the CEC formula kW = (floor area x 0.613) / 1000 + 1.4; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 653 sq ft or smaller.

Climate Zone 12 requirements in full →

HVAC design for Citrus Heights

The California Energy Commission's design-day data for Citrus Heights gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 98°F and a winter design temperature of 24°F.

Summer design (1%)98°F dry bulb / 70°F wet bulb
Winter design (median of extremes)24°F
Daily temperature range36°F
Elevation138 ft

Both seasons matter here. The heat pump is usually sized for the 98°F cooling condition and then checked to confirm it still covers the heating load at 24°F.

Electrical service from Sacramento Municipal Utility District (SMUD)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Sacramento Municipal Utility District (SMUD) handles that through its Design & Construction Services, separately from the building permit.

ADU electrical service with Sacramento Municipal Utility District (SMUD) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
SacramentoCZ 12Sacramento Municipal Utility District (SMUD)1,720
FolsomCZ 12Sacramento Municipal Utility District (SMUD)189
Fair Oaks (unincorp.)CZ 12Sacramento Municipal Utility District (SMUD)64
Orangevale (unincorp.)CZ 12Sacramento Municipal Utility District (SMUD)60
Carmichael (unincorp.)CZ 12Sacramento Municipal Utility District (SMUD)58
Elk GroveCZ 12Sacramento Municipal Utility District (SMUD)54

Sacramento County → · All California cities and communities →

Ready for permit-ready MEP plans in Citrus Heights?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Citrus Heights; requirements vary by project. Confirm with the City of Citrus Heights building department.