MEP Plans in Bonita, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Bonita (unincorporated San Diego County), prepared for plan check at San Diego County Planning & Development Services – Building Division, with Title 24 available in the same order.

Start My Bonita Order See Pricing

Bonita project facts we design around

CountySan Diego County (unincorporated)
Title 24 climate zoneClimate Zone 7, confirmed by ZIP for every project
Electric utility (most addresses)San Diego Gas & Electric (SDG&E)
Permits issued bySan Diego County Planning & Development Services – Building Division
ADU permits issued, 2021–202576
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Bonita

San Diego County issued 76 ADU building permits from 2021 through 2025 for addresses in Bonita, based on the county's reports to the state. Permits went from 20 in 2021 to 9 in 2025.

20212022202320242025
20617249

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 7

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Solar PV sized by the CEC formula kW = (floor area x 0.572) / 1000 + 1.15; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,136 sq ft or smaller.

Climate Zone 7 requirements in full →

HVAC design for Bonita

The California Energy Commission's design-day data for Bonita gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 81°F and a winter design temperature of 28°F.

Summer design (1%)81°F dry bulb / 66°F wet bulb
Winter design (median of extremes)28°F
Daily temperature range20°F
Elevation105 ft
Heating degree days1,864

Both seasons matter here. The heat pump is usually sized for the 81°F cooling condition and then checked to confirm it still covers the heating load at 28°F.

Electrical service from San Diego Gas & Electric (SDG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, San Diego Gas & Electric (SDG&E) handles that through its My Project Center portal, separately from the building permit.

ADU electrical service with San Diego Gas & Electric (SDG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
San DiegoCZ 7, 10San Diego Gas & Electric (SDG&E)7,891
Chula VistaCZ 7, 10San Diego Gas & Electric (SDG&E)968
OceansideCZ 7San Diego Gas & Electric (SDG&E)689
EncinitasCZ 7San Diego Gas & Electric (SDG&E)556
VistaCZ 7San Diego Gas & Electric (SDG&E)475
EscondidoCZ 10San Diego Gas & Electric (SDG&E)446

San Diego County → · All California cities and communities →

Ready for permit-ready MEP plans in Bonita?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Bonita; requirements vary by project. Confirm with San Diego County Planning & Development Services – Building Division.