Electric utility guide · Redding Electric Utility

ADU Electrical Service with Redding Electric Utility

How to get a service upgrade, a new or separate meter, or a relocated service from Redding Electric Utility when you add an ADU, and what our electrical plans give you for that application.

Order ADU Electrical Plans About electrical plans

Who Redding Electric Utility serves

Municipal electric utility of the City of Redding, California. Of the California places we cover, 1 is served mainly by Redding Electric Utility, and together they issued 77 ADU building permits from 2021 through 2025.

How Redding Electric Utility handles new and upgraded service

Redding Electric Utility handles new service, service upgrades and meter changes through its Distribution Planning group. This is separate from the building permit, so start it as soon as the electrical load calculation shows what the ADU needs. The steps Redding Electric Utility describes:

  1. Submit the appropriate forms to the City of Redding Building Division.
  2. Call an REU Distribution Planner and submit the Electric Service Application (an ADU version exists) and required information; for ADUs, contact REU to coordinate the proposed service location.
  3. The Distribution Planner provides requirements for easements, fees, conduits, vaults, boxes and secondary conductors; return the confirmation letter, fees and easements as required.
  4. Submit for approval any meter panel rated over 200 A.
  5. REU schedules the project once the above is complete.
  6. Install underground facilities per Construction Standards Section 500; REU System Inspector approves conduits/substructures before backfill.
  7. Building Division inspects and approves the meter panel; permits and final inspections must be completed before REU establishes service and sets the meter.
  8. Panel change-out on an existing home: complete forms including the Electric Load Information form, call a Distribution Planner, get a Building Division permit, call REU to disconnect, replace panel, pass Building inspection, call REU to reconnect.

What Redding Electric Utility asks for

  • Electric Service Application (ADU form: primary residence main switch size, ADU square footage, ADU service size requested, voltage, A/C tonnage, proposed PV, EV charger)
  • Site plan showing the ADU's relationship to the primary residence, including the existing electric service location (ADU form)
  • Load calculations per CEC Article 220 (estimated maximum demand, largest motor HP, desired service voltage)
  • Plot/site/electrical plan (PDF/paper and AutoCAD) with property lines, building outlines, utilities, service equipment locations, easements, north arrow
  • EUSERC submittals for meter panels over 200 A

Our ADU electrical plans include the NEC Article 220 load calculation, panel schedule and single-line diagram, which cover the load and equipment information on this list. Site-plan and service-location details come from your architectural set.

A separate meter for the ADU

City of Redding ADU Information Packet: an electric meter is required for a new detached or attached ADU, otherwise optional; coordination with REU is required and the Electric Service Application ADU form must be submitted for new attached/detached ADUs (optional for conversions). REU's ADU form states REU determines service and conduit sizes and that service panel locations are subject to REU approval; some existing panels may need relocation.

Whether a separate meter makes sense depends on the load calculation, the existing service size and the cost of the utility work. See when a separate service is required instead of a subpanel.

Service requirements

Meter location, clearances and service equipment must follow City of Redding Electric Service Policy (rev. Oct. 20, 2020) and Construction Standards Section 500 - Electric. We show the meter and service equipment on the electrical plan so the location can be confirmed with Redding Electric Utility early.

Places Redding Electric Utility serves that we cover

PlaceCountyClimate zoneADU permits 2021–25
ReddingShastaCZ 1177

Sources

Summarized from Redding Electric Utility's published pages. Utility processes, forms and rules change, so confirm the current requirements with Redding Electric Utility (contact) before you apply.

Need ADU electrical plans for a Redding Electric Utility service request?

We prepare the load calculation, panel schedule and single-line diagram the utility and the building department both review.

Start My Order